However, the following benefit should be realized: Impact: There are negligible cost impacts. The updated UFC is designed to be consistent with and to supplement the guidance contained in 2015 IBC as modified by UFC 1-200-01. Seismic Hazard Analysis for Kwajalein Atoll, Republic of the Marshall Islands, dated August 2015 Reasons for Changes: Updated seismic design value for the Kwajalein based on ERDC Report, Probabilistic (All references to 2012 IBC have been updated to 2015 IBC) Defines DOD specific special Inspection requirements. Eliminated call for specific type of joint in Section B.2 & E-3 (control).Īdopts 2015 IBC. Added OCONUS seismic risk conversion equations in Table F-3 footnote. Revised Table E-1 Wind Speeds for Elmendorf AFB & Fort Richardson, Alaska. Site-specific structural load data tables for seismic ground motion parameters are updated to the risk-adjusted maximum considered earthquake values and include the peak ground accelerations from ASCE/SEI 7-10. Speed values from 2012 IBC which are the basic wind speed values from ASCE/SEI 7-10. Site-specific structural load data tables for wind are updated to the ultimate design wind Live load table is updated to coordinate with 2015 IBC.
#Ufc 3 301 01 code#
This UFC adopts the structural design provisions of the 2012 International Building Code (2012 IBC) for use in DoD building design and renovation. Subject: UFC 3-301-01, Structural Engineering Cancels: UFC 3-301-01, Structural Engineering dated 27 January 2010 with change 3 of 31 January 2012 Description of Changes: UNIFIED FACILITIES CRITERIA (UFC) REVISION SUMMARY SHEET Office of the Deputy Under Secretary of Defense (Installations and Environment) MICHAEL McANDREW Director Director, Facilities Investment and Management Facilities Engineering Center of Excellence AF Civil Engineer Center Army Corps of Engineers Naval Facilities Engineering Command

Chief, Engineering and Construction Chief Engineer U.S. Refer to UFC 1-200-01, DoD Building Code (General Building Requirements), for implementation of new issuances on projects. UFC are effective upon issuance and are distributed only in electronic media from the following source: The form is also accessible from the Internet sites listed below. Recommended changes with supporting rationale should be sent to the respective service proponent office by the following electronic form: Criteria Change Request. Technical content of UFC is the responsibility of the cognizant DoD working group.

Defense agencies should contact the preparing service for document interpretation and improvements. Army Corps of Engineers (HQUSACE), Naval Facilities Engineering Command (NAVFAC), and Air Force Civil Engineer Center (AFCEC) are responsible for administration of the UFC system.

UFC are living documents and will be periodically reviewed, updated, and made available to users as part of the Services responsibility for providing technical criteria for military construction. All construction outside of the United States is also governed by Status of Forces Agreements (SOFA), Host Nation Funded Construction Agreements (HNFA), and in some instances, Bilateral Infrastructure Agreements (BIA.) Therefore, the acquisition team must ensure compliance with the most stringent of the UFC, the SOFA, the HNFA, and the BIA, as applicable. UFC will be used for all DoD projects and work for other customers where appropriate. This UFC supersedes UFC 3-301-01, dated 27 January 2010 with change 3 of 31 January 2012.įOREWORD The Unified Facilities Criteria (UFC) system is prescribed by MIL-STD 3007 and provides planning, design, construction, sustainment, restoration, and modernization criteria, and applies to the Military Departments, the Defense Agencies, and the DoD Field Activities in accordance with USD (AT&L) Memorandum dated. 2 20 June 2016 Adopts 2015 IBC 3 12 Sept 2016 Further updated to reflect 2015 IBC Date Location 1 Updated wind data and other minor modifications. ARMY CORPS OF ENGINEERS NAVAL FACILITIES ENGINEERING COMMAND (Preparing Activity) AIR FORCE CIVIL ENGINEER CENTER Record of Changes (changes are indicated by \1\. Use of the copyrighted material apart from this UFC must have the permission of the copyright holder. APPROVED FOR PUBLIC RELEASE DISTRIBUTION UNLIMITEDĪny copyrighted material included in this UFC is identified at its point of use.